Hash :
9ed01da7
Author :
Date :
2021-03-02T09:47:47
audio: pipewire: Constify and clarify period size calculations Constify the min/max period variables, use a #define for the base clock rate used in the calculations and note that changing the upper limit can have dire side effects as it's a hard limit in Pipewire.